Classic
Head Shed pre-cleaners mount directly
at the 3 o’clock position on your conveyor
head pulley. The blades maintain an angle
to meet the impact from mechanical splices
thus transferring the energy from the
shaft via the air bag. The shaft assembly
is removable for servicing by loosening
4 bolts (2 on each side).
|
Or
you can replace individual blades by removing
just 2 bolts per blade.
A
dual activator tensioning unit powers
the pre-cleaners. It functions on plant
air, water, CO2 or nitrogen. Mechanical
tensioning devices are also available
(see Classic mechanical tensioners literature).
|